Chelopech Mining and Bolkan Mineral and mining
Chelopech Mining EAD - About Gallery with image from DPM's mines and offices Partners Gold and Copper - Glossary Chelopech Mining EAD - Chelopech and Krumovgrad mines home
Chelopech Mining
about
who is who
EIA
operations overview
contacts
OPERATIONS OVERVIEW
INTRODUCTION GEOLOGY MINING PROCESSING ANCILIARY SERVICES

INTRODUCTION
Late in 2002, the parent company operating the Chelopech mine passed into receivership, and day to day operations was left under the control of the largest shareholder /Deutsche Bank/ while a new owner was located [ read more ]

GEOLOGY
The Chelopech deposit represents one of Europe's largest producing gold and copper mines. The deposit comprises a number of discrete ore bodies within an andesitic to dacitic volcanic complex of hostrocks on the northern side [ read more ]

MINING
The mine is access by a 5.5m diameter concrete lined circular steel shaft (Kapitalna Shaft) which is 345m deep (Collar elevation is at 731m ASL). The operations access is on the 405m ASL elevation which handles wagon haulage and hoisting [ read more ]

PROCESSING
The current practice at Chelopech is to use conventional three-stage crushing followed by a two-stage grinding circuit to prepare feed for selective flotation to extract a gold-rich copper concentrate [ read more ]

ANCILIARY SERVICES
Boilers are used at the Chelopech mine site for domestic and heating needs. The boiler house contains two burners and uses bunker oil for fuel. An analytical laboratory has been established with the co-operation of an internationally accredited assayer (SGS) and has ISO Certification [ read more ]


Copyright 2005 | Sitemap
Chelopech Mining / Balkan Mineral and Mining